Quality Heavy Equipment
Nors Equipment Is Ready To Help You Get The Job Done Right

ec550e Large Crawler Excavators

Product ID: EC550E
Description

Reduce costs and boost profits in the EC530E and EC550E. Features including new electro-hydraulic system, Volvo attachments and Fuel Efficiency Report all contribute towards the unrivalled levels of efficiency delivered by these 50-tonne crawler excavators.

Features and Benefits
  • •Boom and arm bouncing reduction technology dramatically reduces machine shock, resulting in a more comfortable and productive operator performance.
  • •For easy operation and reduced operator fatigue, Comfort Drive Control gives operators the opportunity to steer the machine using the advanced joystick rollers with index finger grip, instead of using the pedals.
  • •Maximize machine uptime and reduce repair costs with the CareTrack telematic system. Choose to keep track of your machine yourself or let us take care of it with ActiveCare Direct. Our Volvo Uptime Center will provide telematics monitoring, supplying fleet utilization reporting and notifying you should preventive maintenance action be required.
  • Brochures
  • Featured Specifications
  • Full Specifications
Engine Output - Gross
Imperial Unit hp
Imperial Value 456
Metric Unit kW
Metric Value 340
Unicode e60b
Bucket Capacity
Imperial Unit yd 3
Imperial Value 3.71 - 6.02
Metric Unit m 3
Metric Value 2.84 - 4.6
Unicode e60f
Operating Weight
Imperial Unit lbs
Imperial Value 125575
Metric Unit kg
Metric Value 56960
Unicode e605
Description
Standard Arm Length 11 ft (3350 mm)
Telematics
Telematics Available Standard
Driveline
Engine Manufacturer Volvo
Engine Model D 13J
Displacement 781 Inches³ (12.8 ltr)
Rated Speed 1600 rpm
Engine Output - Net 445 hp (339 kW)
Engine Output - Gross 456 hp (340 kW)
Number Of Track Rollers - Each Side 9
Track Shoe Width 36 inches (900 mm)
Dimensions
Bucket Capacity 3.71-6.02 yd³ (2.84-4.6 m³)
Bucket Weight 5632-7415 lbs (2554-3363 kg)
Transport Length Mono Boom 40 ft 2 in (12240 mm)
Max Transport Height 13 ft 9 in (4200 mm)
Max Machine Width 13 ft 9 in (4200 mm)
Track Length On Ground 14 ft 10 in (4515 mm)
Zero Tailswing No
Heaped Bucket Capacity 4.33 yd³ (3.31 m³)
Variable Undercarriage Availability Yes
Ground Level Reach 39 ft 2 in (11930 mm)
Dig Height 36 ft 9 in (11210 mm)
Dump Height - Mono Boom 25 ft 6 in (7760 mm)
Dig Depth 25 ft 3 in (7690 mm)
Capacities
Fuel Tank 180 gallons (US) (680 ltr)
Performance
Ground Bearing Pressure 9.2 PSI (63.5 kPa)
Arm Tearout 53980 lbf (240 kN)
Bucket Breakout 69270 lbf (308 kN)
Number Of Main Pumps 2
Main Pump - Flow 220 gallons (US) / min (832 lt/min)
Weights
Operating Weight 125575 lbs (56960 kg)
  • Campbell River, BC
  • Cranbrook, BC
  • Fort St. John, BC
  • Kamloops, BC
  • Nanaimo, BC
  • Prince George, BC
  • Terrace, BC
  • Vancouver, BC
  • Vernon, BC
  • Williams Lake, BC
  • Whitehorse, YT
Campbell River, BC

Nors 2011-14th Ave, V9W 4J2

250-286-4954
After Hours:
Cranbrook, BC

Nors
Cranbrook Branch 1032401 Cranbrook Street North Cranbrook, BC, V1C-3T3

250-426-6554
After Hours:
Fort St. John, BC

Nors 12623 Charlie Lake Frontage Road Fort St John, BC V1J 2B0

(250) 785-4237
After Hours:
Kamloops, BC

Nors 1220 Chief Louis Way Kamloops, BC V2H 1J8

(250) 372-3484
After Hours:
Nanaimo, BC

Nors 2115 South Wellington Road Nanaimo, BC V9X 1R5

250-716-8805
After Hours:
Prince George, BC

Nors 7411 Riggs Crescent Prince George, BC V2N 0H1

(250) 612-0299
After Hours:
Terrace, BC

Nors 3830 Sharples Road Terrace, BC V8G 5P8

(250) 635-0978
After Hours:
Vancouver, BC

Nors 18995 - 94th Ave Surrey, BC V4N 4X5

(604) 882-9091
After Hours:
Vernon, BC

Nors 123 L & A Cross Road Vernon , BC V1B-3S1

After Hours:
Williams Lake, BC

Nors 4700 Collier Place Williams Lake, BC V2G 5E9

After Hours:
Whitehorse, YT

Nors 10 Lindeman Road Whitehorse, YT Y1A 5Z6

(867) 456-8213
After Hours:

How Can We Help You?

Back
Exciting Changes Ahead
Same reliable equipment, now under a unified brand.

Great West Equipment is now Nors.
Find out more about our brand evolution and how it benefits your construction projects.